Phase one of the repairs at Eddy’s lane pump station are complete.
Phase one included repacking a leaking 12” valve, repairing a 24” gate valve and packing a 700 hp pump that was leaking.
These repairs saved over 14,000 gallons of treated water that was being lost each day.